SWC Plot Registration application form
|
|
|
|
|
|
|
|
|
|
|
|
A. Details:
|
|
|
I / We submit herewith application for Provisional Fire Approval with details
given below:-
|
|
|
|
|
|
|
|
|
|
|
|
B. Documents:
|
|
|
1. Two sets of all drawings in metric system which should include Block Plan. Typical
Floor Plan, Elevation Plan etc. An AutoCAD drawings CD should be submitted along
with drawings. If the drawings are prepared in Pre DCR utility then also CD should
be submitted to this office.
Block Plan of company should give the details of main entrances, other entrance
to plot, surrounding of plot like any other company, road, etc. Marginal space,
approach roads around the plant, capacity of underground water storage tank and
the details like transformer yard, utility block, raw material and finish goods,
storage, tank farm area, storage of hazardous gases, etc. e.g. details of Basement
LPG, A-class petroleum products, LDO etc.
Elevation Plan and Typical Floor Plan showing exits, Fire escapes, travel distance
along the travel line, terrace level water storage, location of fire duct, fire
extinguishers, hydrant system, sprinkler system, alarm system etc. Details
of Basement, Sub Basement, their ventilation system and exits.
The Architect shall certify the plans, that they abide with D.C. Rules of MIDC and
provisions of NBC wherever necessary. Total Plot area and Total floor wise
Built-up Area including free of FSI are on Architect’s letter head.
|
|
|
2. Payment of Fire Protection Fund Fees and Additional Fire Protection
Fund fees for High Rise Buildings [taller than 15 mtrs]. A separate demand letter
will be issued by Fire Deptt. On the basis of total built up area and height of
building.
|
|
|
3. Brief Note on Activity of Plant with Process Flow Chart along with list of raw
material and finish goods with their quantity, their storage place in the plan should
be marked on block plan.
|
|
|
4. Brief Note on the existing Fire Prevention and Protection measures available
with the company. [For Expansions]
|
|
|
5. Copies of approval taken from Govt. agencies like Chief Controller of Explosives
(CCE), Excise Deptt., MPCB.[if Applicable]
|
|
|
6. If the company is in production, copy of BCC or Part BCC and DCC issued by MIDC
should be enclosed. [For Expansions]
|
|
|
|
|
|
|
|
|
Signature of Applicant / Authorised Person